    MB Hydro Bipole III Riel Station

    Facts:

     

    Project: MB Hydro Bipole III Riel Station
    Client: Manitoba Hydro
    Scope of Work: Synchronous Condenser pipe fabrication and Install. Glycol, lube oil, compressed air, hydrogen, deluge, transformer drains, CO2 & potable water piping systems. IPB buss ducting and conductors installation.
    Year: 2017
    Prime/Subcontractor: Subcontractor
    Location: Manitoba Hydro Riel Converter Station, Winnipeg
    READ MORE

    Diageo – Substation Upgrade

    Facts:

     

    Project: Diageo – Substation Upgrade
    Client: Diageo Canada Inc.
    Scope of Work:
    • Install customer supplied 6,000 amp switchgear E-House.
    • Supply, Install, and design 6,000 and 3,000 amp Cable buss Systems Remove and reinstall (2) 3 MVA Transformers.
    • Supply and maintain 800 kW generator.
    Year: 2017
    Prime/Subcontractor: Prime-contractor
    Location: Gimli, Manitoba
    READ MORE

    Husky Ethanol Refinery Minnedosa, Manitoba

    Facts:

     

    Project: Husky Ethanol Refinery Minnedosa, Manitoba
    Client:
    Scope of Work: Complete Electrical installation including Instrumentation and High Voltage of a new Ethanol Refinery
    Year: 2007 – 2008
    Prime/Subcontractor: Sub-Contractor, Prime Contractor was PCL Industrial hired by Husky Oil
    Location: Manitoba
    READ MORE

    Deacon Water Treatment Plant Standby Generator Building

    Facts:

     

    Project: City of Winnipeg Deacon Water Treatment Plant Standby Generator Building
    Client: City of Winnipeg
    Scope of Work: Complete Electrical Systems for new generator building, Underground Ductbanks, High Voltage Cabling
    Year: 2007
    Prime/Subcontractor: Subcontractor
    Location: City of Winnipeg Water Treatment Plant Winnipeg, MB
    READ MORE

    St. Leon 230KV, 99 Megawatt Windfarm

    Facts:

     

    Project: St. Leon 230KV, 99 Megawatt Windfarm
    Client: MSE Power Systems Inc.
    Scope of Work: Complete assembly and installation of all sub-station equipment for the first Windfarm in Manitoba. This sub-station was built to collect power from the 66 Wind Turbine Generators in the area.
    Year: 2004 – 2005
    Prime/Subcontractor: Subcontractor
    Location: Manitoba
    READ MORE

    Dorsey DC Converter Station Bi-Pole 2 Thyristor Replacement

    Facts:

     

    Project: Dorsey DC Converter Station Bi-Pole 2 Thyristor Replacement
    Client: Manitoba Hydro
    Scope of Work:
    • Complete Electrical Installation including replacement of High Voltage AC/DC Thyristor Valve, High Voltage Substation work, 500 KV Aluminum Buss Work, Motor Controls Centers, Fibre Optics.
    • Complete Mechanical Installation, including HVAC equipment for the valve halls, De-ionized water system for Thyrisor Valve cooling, Millwright installation of miscellaneous metals, railings, pit covers.
    Year: 2003 – 2004
    Prime/Subcontractor: Prime-contractor
    Location: Manitoba
    READ MORE